17 February 2009

bathroom remodel

these were two hellacious weeks! but the look on synthia's face every time she uses it, is well worth it! i also couldn't have done all this work without john.
this new bath consists of a new tub and fixtures, toilet, vanity, sink and faucets, vanity lights, tile shower surround with (4) built-in corner shelves, natural stone tile floor, shower rod, exhaust fan, and added can light above shower with dimmer switches as well as added two can lights in hall entry way. we even provided electrical and water hook-ups for a washer/dryer install in laundry room. all that is left to do is install a mirror and texture/paint.


before
after


before




after



back of shower



john



synthia hard at work


new sink



new floor